Move the link to the Calendar in the Contribute page
Originally created by @BitingBird on #6970 (Redmine)
The link to the Calendar should not be in the “collective process” part, but in the “release-cycle” one.
Related issues
- Related to #7047 (closed)
Edited by BitingBird