Project

General

Profile

Feature #12013

Feature #5464: Revamp Greeter interface

Feature #8230: Greeter revamp: Phase 1

Publish a call for testing the revamped Greeter

Added by alant over 3 years ago. Updated over 3 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
-
Category:
-
Target version:
Start date:
12/02/2016
Due date:
% Done:

100%

Starter:
Affected tool:

Description

It would be nice to have testing feedback before the next spring. I wrote a draft in https://tails.boum.org/blueprint/greeter_revamp_UI/test_greeter_1.0.0-alpha/, that should be reviewed and published.

Associated revisions

Revision 26761631 (diff)
Added by intrigeri over 3 years ago

s/greeter/Tails Greeter/ + add proper app name styling (refs: #12013).

Revision 638e57f1 (diff)
Added by intrigeri over 3 years ago

Simplify post title (refs: #12013).

Revision 2931ee7a (diff)
Added by intrigeri over 3 years ago

Copy'n'paste existing description of Tails Greeter (refs: #12013).

Revision 1b2bc6b3 (diff)
Added by intrigeri over 3 years ago

Document why we revamped Tails Greeter (refs: #12013).

Revision f0a9be6e (diff)
Added by intrigeri over 3 years ago

Various rephrasing (refs: #12013).

Revision 26a88c65 (diff)
Added by intrigeri over 3 years ago

Retitle blog post, and s/revamp/redesign/ (refs: #12013).

Revision 92db84a7 (diff)
Added by intrigeri over 3 years ago

Add paragraph about our donation campaign (refs: #12013).

Revision 8b570f3f (diff)
Added by intrigeri over 3 years ago

Make screenshot more visible (refs: #12013).

We want everyone to see it, even if they're not going to test the ISO.

Revision 0c194cb9 (diff)
Added by intrigeri over 3 years ago

Don't try to use the mirror pool for an ISO that's not available there (refs: #12013).

Revision 86471603 (diff)
Added by intrigeri over 3 years ago

Make links work even from the blueprint (refs: #12013).

Otherwise it's too easy to miss broken links. Happened before.

Revision bfe02e6f (diff)
Added by intrigeri over 3 years ago

Clarify which file to download (refs: #12013).

Revision 3022157d (diff)
Added by intrigeri over 3 years ago

Add bug report requirements (refs: #12013).

As opposed to e.g. 3.0~alpha1, the ISO image people will download will be
constantly changing.

Revision b2e3b6ed (diff)
Added by intrigeri over 3 years ago

Drop duplicate paragraph (refs: #12013).

It makes no sense to explain how to report issues before the reader has had the
chance to try the ISO.

Revision 3877b62d (diff)
Added by intrigeri over 3 years ago

Simplify wording (refs: #12013).

Revision c8ac8182 (diff)
Added by intrigeri over 3 years ago

Simplify again (refs: #12013).

Revision e060ced2 (diff)
Added by intrigeri over 3 years ago

Update publication date (refs: #12013).

Revision b39af703 (diff)
Added by intrigeri over 3 years ago

Publish call for testing (refs: #12013).

History

#1 Updated by intrigeri over 3 years ago

  • Assignee changed from intrigeri to sajolida
  • Target version set to Tails_2.9.1
  • QA Check set to Info Needed

hi sajolida! I'd like to polish and publish this call for testing. I see it as a way to 1. gather feedback before we include the new Greeter in Tails 3.0~beta1 (scheduled for Dec ~23), and 2. show that we're doing good job + call for donations. But I want to coordinate with other blog posts (2.9 release, fundraising drive, November report). So, when would be a good time for me to publish this blog post?

#2 Updated by sajolida over 3 years ago

  • Assignee changed from sajolida to intrigeri
  • QA Check deleted (Info Needed)

Thanks for taking this into account. The calendar I envisioned so far was like this:

  - <2016-11-26 Sat> roadmap
  - <2016-12-09 Fri> monthly report
  - <2016-12-13 Tue> release 2.9
  - <2016-12-19 Mon> mediapart
  - <2016-12-27 Tue> thank you + 33C3

I still plan on doing two posts for December and would like to both spread them as much as possible and have them as visible as possible on /home. The mediapart post is ready (it needs translation but I'll call for that tomorrow probably).

So actually, if you want to publish it very soon (on Sunday or Monday) then it could be on top for one week and I wouldn't have to change my calendar :)

#3 Updated by intrigeri over 3 years ago

  • Subject changed from Publish call for testing greeter alpha to Publish a call for testing the revamped Greeter
  • Status changed from Confirmed to In Progress
  • % Done changed from 0 to 10

#4 Updated by intrigeri over 3 years ago

  • Type of work changed from Promote to Communicate

#5 Updated by intrigeri over 3 years ago

  • Blueprint changed from https://tails.boum.org/blueprint/greeter_revamp_UI/test_greeter_1.0.0-alpha/ to https://tails.boum.org/blueprint/greeter_revamp_UI/test_redesigned_Tails_Greeter/

#6 Updated by intrigeri over 3 years ago

  • Status changed from In Progress to Resolved
  • Assignee deleted (intrigeri)
  • % Done changed from 10 to 100

Also available in: Atom PDF